Help to Buy is changing - Register for our webinar to learn more

How will Foundation 200 work?

We are targeting smaller sites (such as: garage sites or small parcels of land), with easy access to a city centre to ensure the homes can be managed and monitored easily by the selected charity partner.

The individual homes are stackable and moveable. Location and logistics of the sites is critical, ensuring enough room for transport and installation. Each home weighs approximately 9.5t and is delivered on a flat bed lorry and lifted into location with a mobile crane. A maximum of eight homes on each site and these can be stacked two units in height. All homes, staircases and balustrading for upper floors are uniform in design, meaning they can be removed and reinstalled in any order or form on any site.


 

A Foundation 200 timeline


Would you like to get involved? Speak to our team today.